My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
110
>
3500 - Local Oversight Program
>
PR0545039
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 10:15:44 AM
Creation date
12/10/2019 10:00:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545039
PE
3528
FACILITY_ID
FA0010186
FACILITY_NAME
DEL MONTE FOODS PLNT #33 - DISCO WH
STREET_NUMBER
110
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
02
SITE_LOCATION
110 N FILBERT ST
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.1 CALIBRATION SPECIFICATION <br /> Instnment Gas Span Reading Method <br /> PID: HNu, 10.2 ev probe 100 ppm iwbutylene 9.8 t 2.0 55 ppm 1.5 Urn reg <br /> T-robing <br /> 0.25 Unt reg <br /> direct tubing <br /> PID: HNu, 11.7 ev probe 100 ppm isobutylene 5.0 }2.0 68 ppm 1.5 I/m reg <br /> T-tubing <br /> 0.25 Urn reg <br /> direct tubing <br /> FID: OVA-128 100 ppm methane 3.0 t 1.5 100 ppm 1.5 1/m reg <br /> T-tubing <br /> CGI: MSA 260,261,360,or 0.75%pentane N/A 50%LEL 1.5 1/m reg <br /> 361 f 5 % LEL direct tubing <br /> 6.2 AIR SAMPLING <br /> Method and Description: OVM will be used to monitor the area where boring installation is conducted. <br /> Air monitoring readings in the breathing zone will be taken every 15 minutes. If measurements exceed <br /> background levels, personal protection equipment (PPE) may be upgraded. Background concentrations in <br /> air will be established upwind and downwind of the work area before the work begins. The background <br /> concentration will be reestablished each day the project site is entered. <br /> Personnel: Air monitoring will be conducted throughout the source of this work to assess the potential <br /> for exposure to airborne contaminants and hazards to site personnel. Periodic personnel monitoring is <br /> critical due to anticipated exposures changing during the course of excavation. <br /> Areas: All work locations and in the worker's breathing zone. <br /> Results to be interpreted b SC <br /> 16 <br /> SF01001385F.WP5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.