Laserfiche WebLink
f' `fi 1049363V I <br /> fr.� ilme 18,2001 <br /> Page 2 of 3 <br /> Failure on the permittee's part to comply with any provision will be cause for revocation of this permit. <br /> IMMEDIATELY FOLLOWING COMPLETION OF WORK PERMITTED HEREIN,PERMITTEE SHALL FILL OUT AND MAIL NOTICE OF <br /> COMPLETION PROVIDED BY GRANTOR. <br /> I <br /> Permittee's attention is directed to Section 6, "CONTROL OF MATERIALS", of the State Standard Specifications <br /> Reference to Engineer in the State Standard Specifications shall include State Representative. <br /> Permittee is directed to Standard Specification section 7-1.11 Preservation of Property, and Business and Professions j <br /> Code, Section 8771. Permittee shall physically inspect the work site and locate survey monuments prior to work f <br /> commencement. Monuments shall be referenced or reset in accordance with Business and Professions Code. {{i <br /> A prejob conference with the permittee, contractor, and State representative is required prior to start of work. ! <br /> Permittee shall contact the State representative and arrange the meeting. This meeting may be waived at the direction <br /> of the State representative. <br /> Notwithstanding General Provision#4, your contractor is required to apply for and obtain an encroachment permit prior <br /> to start of work. <br /> Permittee shall, prior to commencement of any work, provide the State representative with the name and phone <br /> number of the person in responsible charge of the work to be performed under this permit. <br /> Traffic control shall be done in conformance with Caltrans Manual of Traffic Controls 1996. <br /> In addition to General Provision 35, "Notification of department and TMC",the permittee shall notify the <br /> Department's representative AND THE TRANSPORTATION MANAGEMENT CENTER(TMC) immediately prior to <br /> initiating any traffic control and immediately upon the removal of any traffic controls. The telephone number <br /> for Caltrans District 10 TMC is (209)948-7556. <br /> Flashing arrow signs(Type 1)are required for lane/Shoulder closures on expressways or multilane conventional <br /> highways. <br /> Except when necessary, as determined by the State representative, no installation, construction equipment, or personal <br /> vehicles shall operate or park within the traveled way. <br /> In addition to the attached General Provisions, the following special provisions are also applicable for installation and <br /> monitoring of groundwater monitoring wells: <br /> 1. Unless specifically authorized elsewhere in this permit, survey work shall not be performed: <br /> A. On holidays or an afternoon proceeding a holiday. <br /> B. In medians. <br /> C.When work requires traffic control on lanes. j <br /> 2. Permittee shall furnish, place and maintain required signs, safety equipment, traffic control, and warning devices in <br /> accordance with the manual of Traffic Controls published by the Department of Transportation. <br /> 3. All personnel shall wear hard hats and orange vests, shirts or jackets as appropriate. <br /> 4. Unless specifically authorized in this permit, markings within the right of way shall be temporary. Paint used for <br /> markings shall be water-soluble and other markers shall be removed upon completion of work. <br /> 5. Any collected data requested by Caltrans shall be furnished to Caltrans without charge. <br /> 6. Vehicles necessary for work may be parked in State Highway right of way off paved shoulders. Auxiliary support <br /> and employee vehicles shall remain outside the right of way. <br /> 7. Permittee shall provide for the safe passage of pedestrians. <br /> 2 <br />