Laserfiche WebLink
MEETING MINUTES <br /> FEBRUARY 11,1998 <br /> Disco PROPERTY <br /> The SJCEHD's closure requirements were discussed. Ron had expressed concern about <br /> benzene concentrations of 6.8 to 1.4 ug/l that had been measured in MW-7D in 1991, 1992, <br /> and 1994. Liz indicated that benzene had been non-detect in that well since July 1994 and <br /> asked if there was a target concentration and time period that needed to be met. Ron said <br /> SJCEHD has closed sites with as much as 200 ug/l of benzene in groundwater. <br /> Steve emphasized that Del Monte did not cause the petroleum release but was trying in <br /> good faith to work with the SJCEHD.He and Richard Fish expressed concern about the cost <br /> of this site to Del Monte ($700,000 to date)and encouraged the SJCEHD to be forthcoming <br /> about the amount and level of detail they need in order to be satisfied that characterization <br /> and remediation is proceeding in a manner that is efficient and that will satisfy their <br /> requirements. <br /> _ After,a short break, the representatives for Del Monte-and Parmaceast concluded that as a- <br /> next step they would proceed with the receptor survey described by Ron. This will involve <br /> updating the survey contained in the 1992 RI report(attached).A more detailed description <br /> of this activity will be developed by Liz for review by others. Ron and Liz discussed the <br /> schedule for this activity and agreed that obtaining data from water purveyors may take the <br /> longest amount of time. Ron said SJCEHS would help where they could in acquiring data. <br /> r <br /> r <br /> l <br /> i <br /> PAGE 3OF3 <br />