Laserfiche WebLink
06/30/99 WED 16:51 FAX 510 8 8205 CH2M HILL IM002 <br /> 2. .;Grab groundwater samples can be collected of various depth intervals prior to installing <br /> 'wells.Thus will give us a vertical profile of the'grcundwater,and will ensure that we did <br /> not"miss" the plume. Adding this step may lend more credibility to our assumptions of <br /> where to screen.I have proposed that we use CPT for collecting these samples,CPT is a <br /> rapid tool,and the methodology eliminates most cross-contamination issues with <br /> multiple sample depths.I have included this as an additional item to the cost estimate. <br /> The scope is as follows: <br /> • Install"I boring to total"dep6of 150'using Resonant sonic drilling.Temporary <br /> conductor casing will be instilled to a depth of approximately 100 ft bgs. <br /> • Grab groundwater samples to be collected at depths of 110, 130,and 150 ft bgs, <br /> using Hydropunch'rll or similar tool,and rushed to the lab for overnight analysis. <br /> • This boring to remain open overnight,assuming a sufficient clay layer is <br /> encountered that the conductor casing can 'key' into. <br /> • Convert this boring to'a 2-inch PVC monitoring well.The exact depth of this well <br /> will be determined by the results of the of the grab groundwater samples. <br /> • "Install twa additi6&l2-i7nch PVC monitoring wells with 20-feet of 0.010 screen <br /> downgradient of first location using hollow-stem auger. These'wells to be installed on <br /> the freeway shoulder,and 4ill be separated by approxlmately60 to 80 feet. <br /> • Exact depths of wells to be determined by the results of the grab groundwater <br /> samples collected at first location.'Assume 90 ft bgs for costing purposes.'These <br /> wells to be installed at a depth that corresponds with to the most contaminated zone <br /> beneath the site (i.e.likely between 70 and 90 ft bgs.) <br /> • Additional scope for-CPT grab'groundwater samples for 3owngradient wells: ' <br /> • Install 1 CPT boring for lithologic interpretation to a total depth of 130 ft bgs. <br /> • Install 2 CPT borings to 40 ft bgs and collect a grab groundwater sample from each <br /> boring. <br /> • Install 2 CPT borings to 70 ft bgs and collect a grab groundwater sample from each <br /> boring_ <br /> • Install CPT borings to 110 ft bgs and collect a grab groundwater sample from each <br /> boring. <br /> • If'two additional S'VE"wells are to be installed during this scope of work,add an <br /> c <br /> additional$5000 to this scope of work. <br /> Please call me at the above listed number of you have any questions. <br /> please call if pages ars missing or illegible or if you receive this fax In error. <br /> 06/30/99 WED 15:47 [TX/RX NO 86421 <br />