My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
110
>
3500 - Local Oversight Program
>
PR0545039
>
SITE INFORMATION AND CORRESPONDENCE_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 11:15:59 AM
Creation date
12/10/2019 10:07:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1
RECORD_ID
PR0545039
PE
3528
FACILITY_ID
FA0010186
FACILITY_NAME
DEL MONTE FOODS PLNT #33 - DISCO WH
STREET_NUMBER
110
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
02
SITE_LOCATION
110 N FILBERT ST
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Del Monte Foods— Research Center <br /> 205 North Wiget Lane(94598-2458) , <br /> .P.O. Box 9004 ��� .i r -Al-l li <br /> Walnut Creek, CA 94598-0904_ x <t Y ! <br /> Telephone: (510)944 7300f, 99 FEB '7 <br /> FA?;,(510)945.7453 _ _ 1 E,S <br /> 'Certified Mail' <br /> Return Receipt Requested. <br /> February 5, 1999 <br /> Ronald Rowe <br /> LOP/Site Mitigation Unit <br /> San Joaquin County Public Health Services <br /> yT 304 E Weber Ave., Third`Floor <br /> Stockton, CA 95202 <br /> Subject: Disco Site Update And Next Quarterly Monitoring Event <br /> i <br /> Dear Mr. Rowe: _ <br /> This is an update on recent activities at the Disco Site. In accordance:with your request, the low <br /> area at the old gas pump location was filled with crushed rock, crowned, and compacted to cause <br /> rainwater to run off the area on January 15, 1999. On January 31,Duane Kimball Surveying <br /> resurveyed:all the monitoring well casings. After surveying, Don Light measured the <br /> groundwater elevations of each monitoring well, and replaced several broken concrete . <br /> monitoring well boxes. <br /> The Work Plan For.Additional Field Investigations and CH2M Hill bid were submitted to the <br /> UST Fund in early December 1998 for cost pre-approval. The Fund did not approve the package <br /> because it lacked three bids. Based upon subsequent discussions with the Fund Supervisor to <br /> clarify options to meet the three-bid requirement;-I-am resubmitting the request for cost pre- <br /> approval today, February 5. 1 have attached a copy of my cover letter for your information. <br /> Next Tuesday,February 9, Don Light is scheduled to start the next round of monitoring well <br /> sampling; which normally takes two days to complete. I plan to be at the site, as usual, the first <br /> day of sampling. _ <br /> if you have.any questions, you can rea_clime at 925-944-7276. <br /> Sincerely, <br /> Richard Fish <br /> Environmental Manager i <br />
The URL can be used to link to this page
Your browser does not support the video tag.