Laserfiche WebLink
FIGURE B-1 <br /> PROPOSED PROJECT SCHEDULE FOR DISCO TANK LOCATION <br /> 4Scbedule begins upon San Joaquin County PHS a oval of s <br /> ppe' vvt►r4cplan.) <br /> WEEKS AFTER PHS APPF.OM WORKPLAN <br /> TASK 1 2 3 4 5 5 7 8 9101.1 12 13 14 15161718192021222324252527282931 <br /> Field Work Preparation <br /> Soil-Gas Survey <br /> Soil Boring Sampling <br /> Lab Analyses of Soil Samples :S <br /> Groundwater Well Installation <br /> Lab Analyses of Water Samples <br /> Report&Recommendations <br /> Elio N A-, ,5 � g <br /> : <br /> LEGEND jj <br /> CHUM HILL <br /> Del Monte <br /> 3 <br /> D Draft <br /> F Final <br />