Laserfiche WebLink
k'q KL EIN.FELDER <br /> 7 LIMITATIONS <br /> Kleinfelder prepared this workplan in accordance with generally accepted standards of care <br /> which exist in .San Joaquin County, California, at this time. It should be recognized that <br /> definition and evaluation of geologic and environmental conditions are a difficult and inexact <br /> science. Judgments leading to conclusions and recommendations are generally made with <br /> incomplete knowledge of the subsurface conditions present. More extensive studies, including <br /> subsurface investigations, may be performed to reduce uncertainties. If the client wishes to <br /> reduce the uncertainties beyond the level associated with this proposal Kleinfelder can be <br /> notified for additional consultation. No warranty, expressed or implied, is made. <br /> Kleinfelder offers various levels of investigative and engineering services to suit the varying <br /> needs of different clients. Although risk can never be eliminated, more-detailed and extensive <br /> investigations yield more information, which may help understand and manage the level of risk. <br /> Since detailed investigation and analysis involves greater expense, our clients participate in <br /> determining levels of service which provide adequate information for their purposes at <br /> acceptable levels of risk. Acceptance of this proposal will indicate that Del Monte Foods has <br /> reviewed the scope of work and determined that it does not need or want a greater level of <br /> service than will be provided. Any exceptions should be noted and may result in higher fees. <br /> Regulations and professional standards applicable to Kleinfelder's services are continually <br /> evolving. Techniques are, by necessity, often new and relatively untried. Different professionals <br /> may reasonably adopt different approaches to similar problems. Therefore, no warranty or <br /> guarantee, expressed or implied, will be included in Kleinfelder's scope of service. <br /> During the course of the performance of Kleinfelder's services, hazardous materials may be <br /> discovered. Kleinfelder will assume no responsibility or liability whatsoever for any claim, loss <br /> of property value, damage, or injury that results from pre-existing hazardous materials being <br /> encountered or present on the project site, or from the discovery of such hazardous materials. <br /> Nothing contained in this workplan should be construed or interpreted as requiring Kleinfelder to <br /> assume the status of an owner, operator, generator, or person who arranges for disposal, <br /> transport, storage or treatment of hazardous materials within the meaning of any governmental <br /> statute, regulation or order. Del Monte Foods will be solely responsible for notifying all <br /> governmental agencies, and the public at large, of the existence, release, treatment or disposal of <br /> any hazardous materials observed at the project site, either before or during performance of <br /> Kleinfelder's services. Del Monte Foods will be responsible for all arrangements to lawfully <br /> store, treat, recycle, dispose, or otherwise handle hazardous materials, including cuttings and <br /> samples resulting from Kleinfelder's services. <br /> 12280.GLAC/ST03P010 Page 10 of 11 <br /> Copyright 2003,Kleinfelder,Inc. January 15,2003 <br />