Laserfiche WebLink
DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br /> MONITORING WELL FIEF LOG 1995 <br /> ESMPLE LOCATION/MW - 6 DATE: <br /> PROJECT NAME: DELMONTE-STOCKTON ANALYSIS PERFORMED: SEE CHAIN OF CUSTODY <br /> ADDRESS: 110 FILBERT SAMPLE TIME: 16:00 <br /> CM. STATE: STOCKTON,CALIF. SAMPLE CONTAINERS: 4 V.O.A.'&/1 BLANK <br /> SITE CONTACT: RICHARD FISH PRESERVATIVES: HCL. <br /> CONSULTANT: DELMONTE LAB.ANALYSIS BY: BSK LABS <br /> i <br /> -fir......: ...-..::',... -:..:. '... <br /> PROJECT MANAGER RICHARD FISH MONUMENT: FLUSH <br /> SAMPLER: GT <br /> DEECH WELL CASING MATERIAL PVC <br /> SIGNED: WELL CASING DIA.: 2" / 0.1632 <br /> SAMPLE ME GROUNDWATER P.I.D.READING/ODOR: 0 NONE <br /> � <br /> TOP OF CASING EL ATION: MSL COLOR: BROWN TO CLEAR j <br /> DEPTH TO WATER: (feet,lWth's) 48.59 I:q--ET CALC.PURGE VOL.: 6.676512 GAL. <br /> DEPTH OF WELL: (feetaooth-S) 89.50 FEET TOTAL VOLUME PURGED: 21 GAL. <br /> STANDING WATER COLUMN: 40.91 FEET DEPTH OF PUMP 84 FEET <br /> FIELD PARAMETERS <br /> TIME (:ASL\GDRAW SUBMERS1 pH E.C. TEMP. O.R.P. ISSOLVEE TURBIDITY <br /> VOLUME DOWN RATE OXYGEN COLOR <br /> PER PURGE (D.T.1n'.) (GPWLPM) (uniu) (UsMHOS) (Celsius) (MV0115) (PPM) (NT.U.) <br /> 0 NIA 1.5 GPM 7.29 370 19.4 184 NIA BROWN j <br /> 7 " " 7.30 420 21.1 169 " 0. <br /> 14 7..30 418 21.3 I64 CLEAR <br /> 21' 7.30 409 21.4 156 1. <br /> I <br /> PURGE METHOD: 2"GRUNDFOS SUBMERSIBLE PUMP. <br /> SAMPLE,METHOD: 1'STAINI_E.SS S'170 BAILER W/STAINLESS STEEL WIRELINE <br /> D.T.W.AFTER PURGE: D.T.W.AT SAMPLETIME: 49.23' <br /> WELL INTEGRITY: CAP&SEAT.ARE SECURE. <br /> WELL LOCATION: SFE SITE M.-N.P. <br /> REMARKS.- <br /> WEATHER: <br /> EMARKS:WEATHER: OVERCAST SKIES. WIND: NW5 <br /> QUALITY CONTROL: ALL PURGING EQUIPMENTAND SAMPLING EQUIPMENT'WAS CLEANED INTNE <br /> FIELD WMf A STEAMCLEANER do ALCONOX SOAP. NEW NITRILE GLOVES. ) <br /> CONTAINM E1h I': D.O.T. 1755 GAL STEEL DRUM OR 60 GAL POLYDRUM. <br /> INSTRUMENTATION: Y.S.I.3560 FLOWCF.LL Y.S.I.DISSOLVED OXYGEN WM <br /> SOLI\1ST SLOPE METER TIERMODINE 580B P.I.D. <br /> 1"ECK INTERFACE M=- TURBIDITY METER <br /> — I <br />