Laserfiche WebLink
DEL-TECH Geotechnical support Services <br /> MONITORING WELL FIELD LOG 1997 <br /> ............... <br /> . ............... <br /> ................ <br /> .......... <br /> .......... ....... ..... ................... <br /> A <br /> ............................-- <br /> ............................................. <br /> im' . . .. . <br /> .................... ...... <br /> a <br /> .......... <br /> ................................ <br /> ..................... . ................... ................................ <br /> 1 41 .. .. ..... ...- <br /> NP <br /> ........... ... <br /> px�..� -.- -.4 . 0A U <br /> .......... �PRPX."TW <br /> "I""' <br /> Xfi N': A <br /> ................... ................ ............. <br /> ....................... ................... <br /> E .4w <br /> ... .. .. <br /> 4-114 4 <br /> ............... .................. <br /> PROJECT MANAGER: RICHARD FISH SAMPLE LOCATION I MW-: NP-1-90' <br /> SAMPLER: DPN I DATE; 12123197 MONUMENT. FLUSH I CASING MATERIAL: PVC <br /> SIGNED: Mxw WELL HEAD READING(P.I.D.): 0.0 (PPM) <br /> GROUNDWATEP XX bLODGE: IVADOSE: WELL CASING DIA.: I In. IODOR: GAS ODOR <br /> TOP OF CASING ELEVATION: (FEET MSL) CONDUCTOR CASING: YES NO UNKNOWN X <br /> DEPTH TO WATER: 56.10 FEET CALCULATED PURGE VOLUME: 2.20 GAL. <br /> DEPTH OF WELL: 90.00 FEET TOTAL VOLUME PURGED: 6.0 GAL <br /> STANDING WATER COLUMN: 35.45 FEET DEPTH/PLACEMENT OF PUMP: HAND BAILED FEET <br /> . . ............-,.......... .......... <br /> .......... <br /> ............. <br /> 5... . <br /> .......... <br /> V <br /> ................. <br /> . 'K�..O ll� "'.. -:1. <br /> ................ '00 <br /> PO <br /> .. ................. <br /> .. ...... .... ..... <br /> .4 <br /> . ......... ......... <br /> g. ...... <br /> � -.3, <br /> m <br /> ............ <br /> i Pl" <br /> . ............... <br /> .............. <br /> ............. <br /> NX. <br /> NIA <br /> 18.5 GREY <br /> N/A <br /> 7.28 <br /> 7.27 <br /> 17 <br /> .......... <br /> X X. X-N <br /> 34 18.8 <br /> ...... ... .......... <br /> xox�; <br /> '7 . . ... ............ <br /> 4 17.4 ... ............................. <br /> .... 0 ............... <br /> ...................... .......... <br /> ...... .................. <br /> ................ <br /> ... ........ <br /> ............... <br /> ........ .. . .......... <br /> ............. <br /> 0. <br /> . .............. <br /> PURGE METHOD : 5'STAINLESS STEEL HANDBAILER. <br /> SAMPLE METHOD: TSTAINLESS STEEL BAILER. <br /> DEPTH TO WATER AFTER PURGE: DEPTH TO WATER AT SAMPLE TIME: <br /> WELL INTEGRITY: CAP AND SEAL ARE SECURE, LOCK IS INSTALLED. <br /> REMARKS: 0001)RECHARGE. <br /> WEATHER: CLEAR SKIES. <br /> QUALITY CONTROL: ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED IN THE FIELD WITH STEAM <br /> CLEANER &ALCONOX. <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES. <br /> WELL LOCATION: SEE SITE MAP. <br /> CONTAINMENT: D.O.T. 17 DRUMS <br /> INSTRUMENTATION: ORION pH/TEMPERATURE METER ORION CONDUCTIVITY METER SOLINIST SLOPE METER <br /> KECK PRODUCT INTERFACE METER THERMODYNE 580E P.I.D. <br /> YSI 3560 FLOW CELL YSI DISSOLVED OXYGEN METER TURBIDITY METER <br />