My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
110
>
3500 - Local Oversight Program
>
PR0545039
>
ARCHIVED REPORTS_XR0011016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 3:42:45 PM
Creation date
12/10/2019 11:36:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011016
RECORD_ID
PR0545039
PE
3528
FACILITY_ID
FA0010186
FACILITY_NAME
DEL MONTE FOODS PLNT #33 - DISCO WH
STREET_NUMBER
110
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
02
SITE_LOCATION
110 N FILBERT ST
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum No.1 <br /> Del Monte Foods <br /> Plant 33 <br /> Stockton, CA <br /> Air Sparging/Soil Vapor Extraction System <br /> Issued: (6-29-94) <br /> Please consider thefollowing changes/additions part of the <br /> original bid package. <br /> 1 . To arrange for a project site visit, please contact John <br /> Furr, Plant Manager at 209/466-9011 ext. 374. <br /> 2 . Delete Part 2 . 1 D of Section 13002 - Sparging System. The <br /> spargi.ng system shall be included in the lump sum bid <br /> price, not supplied as a rental item. <br /> 3 . To the bid form, upon submittal, please attach a letter <br /> that defines the proposed terms of the rental agreement for <br /> the internal combustion engine package system. The terms <br /> shall include,' monthly rental fee, taxes , deposits if any, <br /> services included with rental (e.g. , maintenance provided) . <br /> 4 . The demister component of the Vapor Extraction System <br /> 1 (Section 13001) shall be either self standing or attached <br /> to a common skid frame with the rest of the system. <br /> 5 . The Contractor shall be responsible for coordination with <br /> PG&E on the supply of natural gas and electrical power to <br /> the site. The Engineer has contacted PG&E and determined <br /> that both services are available in the vicinity of the <br /> project site. The contractor shall be responsible for <br /> supplying all necessary equipment, meters , utility pole , <br /> conductor, piping, and valves necessary for natural gas and <br /> electrical power supply if not supplied by PG&E. <br /> ; I <br />
The URL can be used to link to this page
Your browser does not support the video tag.