Laserfiche WebLink
31604.DSK <br /> WP-SFO <br /> SECTION 02215 <br /> PREPARATION OF SUBGRADE <br /> PART GENERAL <br /> 1.1 WORK INCLUDED <br /> A. This section covers the work necessary for the preparation of the subgrade, <br /> complete. <br /> 1.2 GENERAL <br /> A. The subgrade will be considered as those areas and surfaces of new or <br /> existing streets, alleys, driveways, sidewalks, or other public places upon <br /> which additional materials are to be placed under Contract, or which are to <br /> be constructed or prepared for the future placement thereupon of other <br /> materials. <br /> B. All underground work contemplated in the area of the subgrade shall be <br /> completed and properly backfilled before subgrade work is started. This is <br /> intended to include work on the Contract, work to be performed by the <br /> Owner, or by others. I <br /> C. These Specifications are to be used in conjunction with requirements in <br /> those sections of the Specifications having to do with specific types of base <br /> materials and.pavements. <br /> D. All excavation shall comply with applicable OSHA and local regulations. <br /> PART2 PRODUCTS <br /> 2.1 EXCAVATION AND EMBANKMENT <br /> A. The excavation is unclassified and shall include removal of materials which <br /> are encountered in excavating to the required grades, including existing <br /> pavement and curbs designated to be removed, or as required to accomplish <br /> the construction. <br /> 2.2 EQUIPMENT <br /> A. Furnish all necessary equipment required to accomplish the excavating, <br /> shaping, grading and rolling, and compaction specified herein. <br /> PART 3 EXECUTION <br /> 3.1 SUBGRADE <br /> A. Excavate and shape subgrade to line, grade, and cross-section. Compact <br /> subgrade to 95 percent of maximum density in accordance with . <br /> ASTM D1557. Remove all soft or otherwise unsuitable material disclosed f <br /> by the rolling and replace with suitable material from the excavation. Fill <br /> holes and depressions, which develop under the roller, to the required grade <br /> BAE31604.AS.T1 <br /> 02215 1 PREPARATION OF SUBGRADE ` <br />