Laserfiche WebLink
Mr. Michael Collins <br /> Page 2 <br /> December 15, 1993 <br /> SF031604.AS <br /> As reported in the RI/FS, benzene was found to exceed the hazardous waste Toxicity <br /> Characteristic Leaching Procedure (TCLP) level for benzene of 500 ugll in Monitoring <br /> Wells MW-DIS-1 and -2. Benzene concentrations in Monitoring Wells MW-DIS-1, -2, -3, <br /> and -71) have exceeded the California Maximum Contaminant Level (MCL) for benzene of <br /> 1 µg11 <br /> Del Monte submitted a conceptual remediation plan to Michael Collins of San Joaquin <br /> County Public Health Services (PHS) on August 19, 1993. The remediation plan specifies <br /> air sparging combined with soil vapor extraction (AS/SVE) to remediate the source of <br /> gasoline constituents in the subsurface beneath the Disco Property. <br /> GROUNDWATER MONITORING/QUALITY <br /> The quarterly monitoring event conducted on September 30, 1993 consisted of water level <br /> measurements and groundwater sampling. Water level depths were measured in monitoring <br /> wells MW-DIS-1 through MW-DIS-7S and MW-DIS-713. Monitoring well locations and <br /> groundwater elevation contours are shown on Figure 1. The groundwater elevation contour- <br /> lines shown on Figure 1 indicate that groundwater is flowing in a northwesterly direction` <br /> with a shallow gradient.' Water level elevations from this quarter and previous monitoring <br /> events are summarized on Table 1. <br /> Monitoring wells MW-DIS-3, -4, -6, -7S, and -7D were sampled on September 30, 1993 <br /> as part of the quarterly groundwater quality monitoring program. Monitoring well purge <br /> and sampling data are attached. The groundwater samples were analyzed by the CH2M <br /> HILL Analytical Laboratory for total petroleum hydrocarbons (TPH) as gasoline; and <br /> benzene, toluene, ethylbenzene, and xylenes (BTEX) (EPA method 8015/8020). Results of <br /> the September 30, 1993 sampling event and results from previous sampling events are <br /> summarized on Table 2. The laboratory report is also attached. <br /> No petroleum hydrocarbons were detected in any of the monitoring wells sampled on <br /> September 30, 1993. <br /> SCHEDULE <br /> The current schedule of activities is presented on Table 3. As discussed with Michael <br /> Collins/PHS on December 6, 1993, the schedule for construction of the planned AS/SVE <br /> system has been delayed until April 1994 to provide adequate review time of the air permit <br /> by the San Joaquin Valley Unified Air Pollution Control District. Del Monte is currently <br /> preparing the air permit application and the AS/SVE construction and performance <br /> ( specifications. <br /> quartcrly.rep <br />