Laserfiche WebLink
n <br /> LEL-TECH Geowhr3 cal Support Services <br /> i <br /> MONITORING WELL FIELD LOG <br /> 19% <br /> PROJECT NAME: AMPLE ANALYSIS..PERFORMED: TPM-Gas, B.T.X.E. <br /> :.DELMONTE FOODS 1'DISCO< MPUTIME .14 'C9.-: <br /> 11 Q NORTH FILBERT ST AMPLE CONTAINER(S): HCL PRESERVED <br /> If STOCKTON,CA, USA Vt0 A.'s:& I BAILER:BLANK <br /> ONTAINERS SUPPLIED BY LABORATORY. <br /> NALYSlS;PERFORMED'BY: SHERWOOD LABS.#140Q <br /> LIENT: CH2MHILL DATE: 06/06/1996 <br /> PROJECT MANAGER: CHWHILL AMPLE LOCATION: MW-2 <br /> AMPLER: DON LIGHT TART TIME: <br /> GROUNDWATER: XXX ADOSE: THER:WELL HEAD P.I.D. READING 332.0 PPM <br /> CASING ELEVATION: FEET MSLCASING DIAMETER: 2 INCH <br /> DEPTH TO WATER: 58.22 FEET CALCULATED CASING VOLUME:4.68 GAL. <br /> DEPTH OF WELL: 86.92 FEET ITOTAL VOLUME PURGED: 20.0 GAL. <br /> TIME VOLUME prH, C. TEMP ORP COLOR OTHER <br /> ai)bus nit ;.. Umhgslcm Ike rees:"C: Mvlo S : Visual <br /> 0 7.3 569 24.4 -69 TURBID GAS ODOR <br /> 5.0 7.0 620 22.5 -147 1 1 " <br /> 10.0 7.0 634 22.5 -165 LT. TURBID " <br /> 15.0 6.9 657 22.4 -149 CLEAR " <br /> 20.0 6.9 673 22.4 -163 " <br /> PURGE METHOD : 2"GRUNDFOS STAINLESS STEEL PUMP. <br /> SAMPLE METHOD: 1'STAINLESS STEEL BAILER. <br /> DEPTH TO WATER AFTER PURGE: DEPTH TO WATER AT SAMPLE TIME: <br /> WELL INTEGRITY: CAP AND SEAL ARE SECURE, LOCK INSTALLED. <br /> REMARKS: GOOD RECHARGE. <br /> WEATHER: CLEAR SKIES. <br /> QUALITY CONTROL: ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER&ALCONOX. <br /> I NEW NITRILE GLOVES WERE WORN AT ALL TIMES. <br /> WELL LOCATION: SEE SITE MAP. <br /> CONTAINMENT: POLY DRUMS. <br /> INSTRUMENTATION: ORION pHrrEMPERATURE METER 2 POINT pH CALIBRATION (4.0 &7.0) <br /> ORION CONDUCTIVITY METER <br /> YSl 3560 FLOWCELL CHAMBER 1 D.O. METER <br /> SOLINIST SLOPE METER/KECK PRODUCT INTERFACE METER <br /> THERMODYNE 5808 PHOTO IONIZATION DETECTOR <br />