Laserfiche WebLink
i <br /> Mr. Soon Kim <br /> Page 23 <br /> December 19, 1995 <br /> Future Site Activity <br /> I <br /> First quarter 1996 monitoring is scheduled for mid January. During this next sampling event, <br /> r CH2M.HILL plans to sample all wells for dissolved oxygen, and purge all wells until the <br /> dissolved oxygen,redox potential, and conductivity are more stable before sampling for ITB <br /> parameters. Alkalinity will be added to the list of analyses for next quarter. <br /> E <br /> Please call me at 5101251-2888 ext. 2097 if you have questions or require additional <br /> information. <br /> Sincerely, <br /> I' CH2M HILL <br /> r <br /> Grant Stewart, P.E. <br /> Project Manager <br /> I <br /> Attachments: Monitoring Well Analytical Results and Chain of Custody Forms (BTEX) <br /> Groundwater Field Monitoring Summary Report <br /> Boring Logs and Well Completion Logs <br /> AS/SVE System Monitoring Logs <br /> l Intrinsic Groundwater Field Monitoring Summary Report <br /> Monitoring Well Analytical Results and Cchain of Custody Forms (ITB <br /> parameters) <br /> I <br /> ! <br /> f . <br /> I <br /> 1 <br />