Laserfiche WebLink
Mr. Soon Kim <br /> Page 3 <br /> August 11, 1995 <br /> 102429.AS.T8 <br /> In 1991,at the direction of the PHS/EHD,Del Monte began an investigation of the soil and <br /> groundwater in the vicinity of the Disco site.Del Monte retained CH2M HILL to conduct the <br /> investigation. The investigation consisted of a soil-gas survey to assess the extent of volatile- , <br /> fuel constituents in the shallow soil, seven soil borings to assess fuel constituents in the soil, <br /> and the installation of eight monitoring wells to evaluate fuel constituents in the shallow and <br /> deep groundwater. The results of the investigation revealed the presence of gasoline <br /> constituents in the soil and groundwater. Most of the soil contamination was found below the <br /> former tank pit near the groundwater table,between 55 and 75 feet below ground surface <br /> (bgs). Significant concentrations of gasoline constituents, including benzene up to 32 mg1L, <br /> were encountered in the groundwater. The results of this investigation and a feasibility study <br /> are presented in Del Monte's Remedial Investigation/Feasibility Study(RDFS)(CH2M HILL, <br /> 1992). <br /> At the direction of PHS/EHD, Del Monte is conducting quarterly groundwater monitoring <br /> (since 1991) and operating an active remediation system at the Disco site (since February <br /> 1995). The remediation system consists of air sparging and soil vapor extraction(AS/SVE). <br /> PHS/EHD further directed Del Monte to define the extent of contamination, install an up- <br /> gradient monitoring well and a down-gradient monitoring well pair (one shallow and one <br /> deep), conduct aquifer pump tests, and prepare a Corrective Action Plan that addresses both <br /> soil and groundwater contamination. In response to PHS/EHD's directive, Del Monte <br /> submitted a December 29, 1994, work plan for completing exploratory groundwater sampling,. <br /> well installation,pump testing, and preparation of an Final Remediation Plan. <br /> In April 1995, Del Monte submitted a Problem Assessment Report and Final Remediation <br /> Plan.(PAR/FRP) to describe the supplemental investigation. The PAR/FRP followed the <br /> guidelines of the Tri-Regional Board Staff Recommendations for Preliminary Evaluation and <br /> Investigation of Underground Tank Sites, Appendix A - Reports (Central Valley Regional <br /> Water Quality Control Board, 1991). <br /> Quarterly Groundwater Monitoring Results <br /> Quarterly groundwater monitoring consisted of taking water level measurements and <br /> collecting grab samples for gasoline constituent analysis. <br />