Laserfiche WebLink
i <br /> = PROJECT NUMBER BORING NUMBER <br /> BAE31604.AS.11 NP-1 <br /> SHEET 1 OF 1. <br /> r <br /> SOIL BORING LOG <br /> PROJECT Del Monte Plant 33 LOCATION Stockton, CA <br /> ELEVATION 20 ti MSL D.RILLING CONTRACTOR GREGG Drilling, Inc.. _ <br /> DRILLING METHOD AND EQUIPMENT 10" OD Hollow Stem Auger <br /> WATER LEVELS 7{1 It nets START 11-28-05 FINISH 12-2-05 LOGGER Laton.ya Coleman <br /> SAMPLE STANDARD SOIL DESCRIPTION COMMENTS <br /> ow PENETRATION <br /> i a z � RESULTS SOIL NAME, USCS GROUP SYMBOL, COLOR, DEPTH OF CASING, DRILLING RAT <br /> � a� w MOISTURE CONTENT, RELATIVE DENSITY J <br /> x t u.r a 0 DRILLING FLUID LOSS <br /> f.r 4um 0 g•_g•_B• OR CONSISTENCY, SOIL STRUCTURE, m TESTS AND INSTRUMENTATION <br /> 4. � °-x IN) MINERALOGY }o <br /> OU) ? �z cr= fn-i <br /> } IV., "leolur_1ir. 1(.10 was IecoUeil 1oi 11u; <br /> I'ori>hulc. 111is well duster is adjacent to <br /> MW--I. llsr holing lotl MW-I for gleoloclic log <br /> Irl soils. <br /> f <br /> I <br /> &0 <br /> l <br /> i <br /> I <br /> I <br /> I - <br /> I, . <br /> 15.0 <br /> 20.0 <br /> i <br /> 25.0 <br />