Laserfiche WebLink
i <br /> I = PROJECT NUMBER BORING NUMBER <br /> A AIC) ZI A.S 11 5 - MW- I S-49 SHEET I OF 3 <br /> SOIL BORING LOG <br /> ! .PROJECT Uel Monle Plant :3.3 LOCATION `'tockton, CA <br /> ELEVATION 19.55 fl. MSL (TUC) DRILLING CONTRACTOR Gregg Orill ino, Inc.. <br /> DRILLING METHOD AND EQUIPMENT 8" 00 Hollow Stem Augei _ <br /> NATER LEVELS -47.10 MSL {3/3/95) START 1-17-95 F]NISH 1-I825 LOGGER T Littre <br /> SAMPLE STANDARD SOIL DESCRIPTION COMMENTS <br /> X � PENETRATION <br /> 9 TEST SOIL NAME,USCS GROUP SYMBOL, COLOR, <br /> � a ix w RESULTS MOISTURE CONTENT. RELATIVE DENSITY DEPTH OF CASING, DRILLING RAT <br /> � � w w m o 8'-B'-6' OR CONSISTENCY, SOIL STRUCTURE, m DRILLING FLUID LOSS <br /> W IL f U ^ co TESTS AND INSTRUMENTATION <br /> a z >-- z s (N} MINERALOGY N o <br /> CLAY A). dark yellowish brown (l(IYR <br /> 5/6), 90% low plasticity fines. 10% fine <br /> f sane <br /> I <br /> SA . <br /> J <br /> 10.0 <br /> l <br /> ISA' <br /> f <br /> f 20.0 <br /> 25.0 <br />