Laserfiche WebLink
1 <br /> Prepared: 41194 <br /> Table4.3 <br /> { Del Monte Disco Site(gasoline plume remediation) <br /> Stockton,California <br /> Option B-Pump with Aboveground Treatment System, Conceptual Cost Estimate <br /> Item Units Quantity Unit Price Total Subtotal <br /> 1 CAPITAL COST <br /> Engineering Design LS $ 10,000 $ 10,000 <br /> Bidding&Construction Management. LS $ 5,000 $ 5,000- <br /> Well Construction&Permits EA 2 $ 5,000 $ 10,000 <br /> Building Permit Application LS $ 1,000 $ 1,000 <br /> Air Permit LS -$ 3,000 $ .3,000 <br /> Permit-by-Rule Application LS $ 3,000 $ 3,000 <br /> Sewer Connection Fee LS $ 300 $ 300 <br /> LS $ 1,500 $ 1,500 <br /> Electrical Connection Fee LS $ 4,000 $ 4,000 <br /> Drilling Oversite <br /> Development Water Management LS $ 4,000 $ 4,000 <br /> Well Pumps `EA 2 $ 1,000 $ 2,000 <br /> Piezometers EA 2 $ 2,000 $ 4,000 <br /> Drums 30 $ 80 $ 2,400 <br /> Sail Disposal <br /> 4 $ 200 $ 800 <br /> Base Line GW Monitoring Sample <br /> Stripper LS $ 12,000 $ 12,000 <br /> LS $ 500 $ 500 <br /> Moisture Knock-Out Tank <br /> EA 2 $ 1,500 $ 3,000 <br /> GAC Vessels <br /> Piping w/Secondary Containment LF 400 $ 25 $ 10,000 <br /> LS $ 1,000 $ 1,000 <br /> Leak Detection Equipment LS 2,000 $ 2,000 <br /> Electrical LS $ 2,000 $ 2,000 <br /> Control Panel 4,000 $ 4,000 <br /> 1 Sewer Piping LS $ <br /> LS $ 2,000 $ 2,000 <br /> Continuous LEL Monitor SF 200 $ 7.50 $ 1,500 <br /> Concrete Slab LS $ 5,000 $ 5,000 <br /> i1 Start-Up LS $ 2,000 $ 2,000 $ 96,000 <br /> Health &Safety Plan $ 14,400 <br /> Contractor OH & Profit(15%) $ 27,600 <br /> I <br /> Contin enc 25%) Total Capital Cost $138,000 <br /> ANNUAL OPERATING COST . <br /> 240 $ 55 $ 13,200 <br /> HR <br /> Field Maintenance <br /> Repairs LS $ 3,000 $ 3,000 <br /> Sampling HR 80 $ 55 $ 4,400 <br /> Electrical ai Power KWH 13320 $ 0.11 $ 1,465 <br /> LS $ 2,000 $ 2,000 <br /> GAC Replacement LS $ 1,800 $ 1,800 <br /> Sewer Fees <br /> Laboratory Analysis <br /> -Treatment System(air+water) Sample 30 $ 100 $ 3,000 <br /> - Monitoring Wells Sam le 40 $ 100 $ 4,000 $ 32,865 <br /> System consists of two wells pumping hazardous(6mg/L benzene)groundwater at 0.5 gpm each. <br /> L Present worth factor for 30 yrs of operations based on 8%interest and 5%escalation is 18.93. <br /> Total present worth= $760138 <br /> SF010040170.XLS <br />