Laserfiche WebLink
b. Connection to a public sewer system is required (Development Title Section 9-1105.2(b)). <br /> Connect to an approved public water supply system as required by Development Title <br /> Section 9-1120.2. Prior to issuance of building permits, a letter from the water supplier <br /> will be required which states that they have the capacity to serve the development and <br /> that the system meets State standards. (Development Title Section 9-1100.3) <br /> If the applicant is unable to obtain public services by letter from the City of Lodi, the <br /> following conditions will apply: <br /> (1) The sewage disposal system shall comply with the on-site sewage standards of <br /> San Joaquin County prior to approval of the Improvement Plan. A percolation <br /> test and a sewage disposal area, as determined by the percolation test, are <br /> required prior to approval by the Environmental Health Division. A permit for the <br /> percolation test must be obtained from the Environmental Health Division. <br /> (Development Title Sections 9-1110.3, 9-1110.4(c), and 9-1110.5) <br /> (2) State on revised plans or improvement plans the maximum number of employees <br /> the sewage disposal system is being designed for and that the leach field area <br /> will be barricaded so that it cannot be driven over, parked on, or used as a <br /> storage area. This leach field area must be used for that specific purpose only <br /> and cannot contain any underground utility lines. (Development Title Section 9- <br /> 1110.4(C)(5). <br /> (3) Construct a water well under permit and inspection by the Environmental Health <br /> Division prior to occupancy. Should the number of nonresident individuals <br /> exceed 24 for at least 60 days per year, or the number of service connections <br /> exceed four, a yearly permit to operate a public water system, under the <br /> provisions of the California Code of Regulations, Title 22, will be required by the <br /> Environmental Health Division and by Development Title Sections 9-1120.2 and <br /> 9-1115.9. <br /> 4. SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT: (Staff Contact: David <br /> J. Stagnero, 545-7000) <br /> a. The project shall comply with the District's Fugitive Dust Rules, Regulation VIII, to reduce <br /> the amount of dust and ozone precursors that will result from project construction. <br /> 5. CITY OF LODI: (Staff Contact: James B. Schroeder, 334-5634) <br /> a. The owner shall dedicate necessary street rights-of-way and corner cut-offs as set out in <br /> an agreement entered into by the City of Lodi and Carl Fink on November 19, 1992. <br /> b. The owner shall enter into an Improvement Deferral Agreement with the City of Lodi for <br /> street improvements (curb, gutter, sidewalk, paving, etc.) along the Harney Lane right-of- <br /> way. <br /> C. The owner or owner's contractor shall obtain an encroachment permit from the City of <br /> Lodi Department of Public Works for the construction of the driveway along Harney Lane. <br /> NOTE: On July 7, 1994, the San Joaquin County Planning Commission approved UP-94-8 subject to the <br /> Conditions of Approval listed above. <br /> Conditions of Approval - 3 - UP-94-8 <br />