Laserfiche WebLink
a. <br /> GROUNDWATER SAMPLING FORM <br /> PROJECTINFORMATION! <br /> `..�PROJECT NAME: 'S rS �� PROJECT NUMBER:!S�zz!S . ELL NO. I;�l <br /> PROJECT MANAGER: TYPE OF WELL: _/�Monitoring Extraction Other <br /> RECORDED BY: SAMPLED BY: A F DATE: <br /> WE1_L."FURGtNG fNFORINATION <br /> PURGE VOLUME PURGE METHOD <br /> Well,pe6ing Diameter <br /> 2-inch 4-4nch Other _zBailer - Type-7-,/-/e/-7 <br /> Pump - Type <br /> Well Total Depth ��c� feet below Top of Casing,TD Other - Specify <br /> Depth to Water �6 '�o feet below Top of Casing,WL <br /> Hydrocarbon Odors- <br /> Water Column Length feet <br /> Purge Volume Calculation (Water Column Length x Multiplier x No.Volumes = Calculated Purge Volume) <br /> ! <br /> ! t s X © X _ , 1 1 Calculated Purge Volume = -7- 11 -gallons <br /> (WCL) (Multiplier) (No.Volumes) Actual Purge Volume = + gallons <br /> Muftlier Casing:Giametevches. -:Gallonsfiinear foot 2=0.17...;4:= 66. ::5 .1.E.;::8. 2 6: <br /> Groundwater Parameter Measurement Meter Type cs alibrated:_Yes No <br /> TIME ELAPSED FLCWRATE DTW pH EC TE TURBIDITY REDOX COMMENTS <br /> TIME (GPM) (ft) anhos/cm eg C NTU) mV <br /> A <br /> Og3? f43G fo. 0.11 1112, <br /> 4 l /' 60 a �r <br /> 084 at 7 1 151 745 L .S <br /> 8" 1I7, 7- 69 1. 0 20. <br /> © a -37g 709 1PI zo• t 40 <br /> i <br /> i <br /> I <br /> i <br /> 17 <br /> SSOCIATES INC. <br /> i EWRONMENrAL,GEOTECHNICAL AND MATERIALS PROFESSIONALS <br />