Laserfiche WebLink
3 E & E START Field Activities <br /> E & E START performed field sampling activities in accordance with the FSP dated August <br /> 2010 and approved by the U.S. EPA Quality Assurance Office on December 10, 2010. The <br /> approved FSP was assigned U.S. EPA Quality Assurance Program document control number <br /> BNFD0424SV2. Photographic documentation of the investigation is included in Appendix B. <br /> On January 18 through 21, 2011, the START conducted the sampling and data gathering <br /> activities at the subject property. A subcontracted drilling contractor, RSI Drilling, mobilized to <br /> the property on January 18, 2011 and conducted subsurface soil and groundwater sampling from <br /> 11 boring locations using direct push drilling methods. <br /> 3.1 Deviations from FSP <br /> The following deviations from the FSP (E & E 201Oa) resulted from changes made during the <br /> field investigation in response to field observations and conditions: <br /> • The FSP indicated that the groundwater soil samples would be collected from all 12 of <br /> the boring locations; however, two borings (EC2-03 and EC2-12)were dry when drilled <br /> to 56ft bgs, and only soil samples were collected at these locations. Boring EC2-11, <br /> which was planned to be located inside the fire station, was not drilled due to the drill rig <br /> being too large to fit inside the fire station garage and the fire station being too active <br /> with fire engines to disrupt their work. <br /> • The FSP indicated that soil vapor samples would be collected at two locations, EC2-11 <br /> and EC2-12. EC2-11 was located inside the fire station garage but due to the constant <br /> activity of trucks inside the garage this sample was not collected. EC2-11 was to be <br /> collected above the location of the former gasoline UST; however, a large fork lift was <br /> broken down above the former UST location and it could not be moved; therefore, no soil <br /> vapor sample was collected. <br /> • The FSP indicated that a duplicate groundwater sample (EC2-W-109) would be collected <br /> at the EC2-9 location. However, there was not enough groundwater to collect the <br /> duplicate sample at this location and it was not collected. <br /> 3.2 Sampling <br /> The following sections describe the sampling conducted from January 18 to 21, 2011. <br /> 3.2.1 Surface and Subsurface Soil Sampling <br /> START collected 11 surface soil samples, 44 subsurface soil samples, and six duplicate soil <br /> samples from 11 borehole locations. The borehole locations are shown on Figure 3 (Appendix <br /> A). After collection, all samples were placed in coolers and kept chilled on ice for storage and <br /> shipment to the analytical laboratories. All soil samples were collected in accordance with the <br /> 3-1 <br />