My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FIRST
>
1116
>
2900 - Site Mitigation Program
>
PR0535915
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 8:35:54 PM
Creation date
12/10/2019 4:57:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0535915
PE
2950
FACILITY_ID
FA0020680
FACILITY_NAME
EL CONCILIO NO 2 PROPERTY
STREET_NUMBER
1116
Direction
E
STREET_NAME
FIRST
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16903006
CURRENT_STATUS
01
SITE_LOCATION
1116 E FIRST ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..aop.w...xv...41.�. <br /> 6. Field Methods and Procedures <br /> 6.4 Groundwater Sampling Procedures <br /> After the collection of soil and soil gas samples, a direct-push drilling rig will be advanced to <br /> groundwater. A temporary 1-inch polyvinyl chloride screen will be placed in the boring, and <br /> groundwater samples will be collected using a disposal bailer and placed into new precleaned, <br /> certified sampling containers. Water samples will be placed in coolers and chilled with ice to <br /> 4°C for storage and shipping to the analytical laboratory. <br /> Duplicate groundwater samples will be collected in the same manner and two sets of sample <br /> containers will be filled. Groundwater samples will be collected in accordance with the following <br /> standard operating procedures contained in Appendix D of the TBA SAP: <br /> • Ecology and Environment,Inc. SOP#ENV 3.3: Borehole Sampling <br /> • Ecology and Environment, Inc. SON ENV 3.6: Groundwater Sampling Devices <br /> When sampling is completed, each borehole will be tremie grouted through the temporary well <br /> screen with neat cement and finished at the ground surface to match surrounding materials. <br /> 6.5 Decontamination Procedures <br /> The decontamination procedures used for this TBA are presented in the TBA SAP. <br /> 00002693.1501.OIBR 6-2 <br /> EI C.wilio No.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.