My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FLOOD
>
24400
>
2900 - Site Mitigation Program
>
PR0527413
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 9:29:52 AM
Creation date
12/11/2019 9:08:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0527413
PE
2950
FACILITY_ID
FA0018560
FACILITY_NAME
PG&E BELLOTA SUBSTATION
STREET_NUMBER
24400
Direction
E
STREET_NAME
FLOOD
STREET_TYPE
RD
City
FARMINGTON
Zip
95236
APN
09310005
CURRENT_STATUS
01
SITE_LOCATION
24400 E FLOOD RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drill Report <br /> Permit No. 07-390-SB <br /> January 8, 2008 <br /> All soil samples were also analyzed for moisture content using EPA Method 160.3 so that analytical <br /> ' results could be presented on a dry weight basis. <br /> The analytical data for these soil samples are presented in the analytical report which has been <br /> ' included as Appendix B. <br /> Decontamination Procedures <br /> ' Direct-push drill rods, the hand auger, shovels, and post-hole digging tools were decontaminated <br /> between boreholes using a steam cleaner. Hand sampling tools (such as hand trowels) and core <br /> shoes were decontaminated using a three step wash, which consisted of scrubbing with brushes, <br /> twashing with Liquinox® and potable water, and finishing with two distilled water rinses. <br /> All decontamination wastewater was subsequently transferred into a UN-rated 55-gallon drum and <br /> ' staged onsite with the drums containing soil cuttings. A representative water sample was collected <br /> from each drum for analytical testing to profile the waste for subsequent disposal off-site. <br /> ' Closing <br /> For reference, we have attached a copy of the approved permit as Appendix C. Should additional <br /> ' information be required or if you have any comments and/or questions, please do not hesitate to <br /> contact me at: (619) 297-1991 Extension 28. <br /> Respectfully submitted, <br /> ' Terra Pacific Group Incorporated <br /> Jennifer Gruda, PE <br /> Project Engineer <br /> ' Enclosures: <br /> Figure 4-1- Site Plan <br /> Figure 4-2- Details A and B with Boring Locations <br /> ' Appendix A Boring Logs <br /> Appendix B- Analytical Report <br /> Appendix G Approved Permit <br /> ' cc: Robert Gray,Pacific Gas and Electric Company(1 copy) <br /> ' TERRA PACIFIC GROUP Page 3 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.