Laserfiche WebLink
P:Dratti Pro ects PGE-1035-4 Bel ota 00 GE•1035-400-Bellota-Site a dw 1 04 200 <br /> I <br /> TRANSFORMER <br /> HANDLING TOWER EXPLANATION <br /> —K- - FENCE <br /> RAILROAD TRACK <br /> FORMER SITE FEATURES <br /> SUBSTATION EQUIPMENT <br /> BEL-] E / / OVERHEAD POWER POLES AND TOWERS <br /> SOIL BORING LOCATION <br /> AST ABOVEGROUND STORAGE TANK <br /> BEL 3 <br /> BEL-2 <br /> TRANSFORMER <br /> REPAIR BUILDING <br /> DETAIL A: TRANSFORMER REPAIR BUILDING <br /> 0 20 40 FEET <br /> APPROXIMATE SCALE <br /> CONCRETE FOUNDATION +/ <br /> FORMER OIL PUMP HOUSE +/ <br /> VAULT WITH +/ <br /> } UNDERGROUND PIPING <br /> `Il +/ <br /> BEL-6 CONCRETE PAD FOR +/ <br /> BELE FORMER OILASTs <br /> BEL-4* <br /> I � / <br /> /+ FORMER OIL ASTs <br /> +/ I <br /> FIGURE 4-2 <br /> DETAILS A AND B <br /> WITH BORING LOCATIONS <br /> DETAIL B: ABOVEGROUND STORAGE TANKS PG&E BELLOTA SUBSTATION <br /> 0 20 40 FEET PACIFIC GAS AND ELECTRIC COMPANY <br /> BELLOTA SUBSTATION <br /> APPROXIMATE SCALE LINDEN, CALIFORNIA <br /> SOURCE:PACIFIC GAS AND ELECTRIC COMPANY ERRA PACIFIC GROUP <br /> DRAWING 400666, GENERAL ARRANGEMENT <br /> OUTDOORS BELLOTA SUBSTATION Environmental Engineering,Consulting,and Construction <br />