My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FLOOD
>
24400
>
2900 - Site Mitigation Program
>
PR0527413
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 9:23:29 AM
Creation date
12/11/2019 9:09:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527413
PE
2950
FACILITY_ID
FA0018560
FACILITY_NAME
PG&E BELLOTA SUBSTATION
STREET_NUMBER
24400
Direction
E
STREET_NAME
FLOOD
STREET_TYPE
RD
City
FARMINGTON
Zip
95236
APN
09310005
CURRENT_STATUS
01
SITE_LOCATION
24400 E FLOOD RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TERRA PACIFIC GROUP 13900 Alton Parkway Suite 122 Irvine CA 92618 <br /> Environmental Engineering,Consulting,and Construction (949)297494•FAX(949)297-3625 <br /> September 14, 2007 <br /> Ms.Julie Shoruidge <br /> ARCADIS BBL <br /> 2033 North Main Street,Suite 340 <br /> Walnut Creek, CA 94596 <br /> RE: Workplan Summaries —Six Central Valley Sites <br /> Dear Ms. Shortridge: <br /> This document presents site-specific workplan summaries of the proposed sampling to be <br /> conducted by Terra Pacific Group Incorporated (TPG) at the seven Pacific Gas and Electric <br /> Company (PG&E) active substation facilities located in California's Central Valley. These <br /> investigations are focused on the oil-handling buildings and mineral oil distribution systems <br /> (excluding piping) which were used historically for regular maintenance and repair of transformers at <br /> each substation. The seven substation facilities are located at the following Central Valley locations: <br /> • Stockton A Substation, 540 S. Center Street, Stockton, California <br /> • Bollota Substation, 24400 E. Flood Road,Farmington, California <br /> • Wilson Substation, 4400 E.Highway 140 (at N. Tower Rd.),Merced, California <br /> • Los Banos Substation, 16182 Jasper-Sears Rd., Santa Nella, California <br /> • Panoche Substation,West of Panoched Rd.,2 miles east of I-5,Mendota, California <br /> • Gates Substation,West Jayne Avenue, 1 mile west of Lassen Ave., Huron, California <br /> • Midway Substation,40358 Highway 58,Buttonwillow, California <br /> The scope of the sampling activities proposed at each substation was developed based on the review <br /> of facility plans provided by PG&E, site visits to each facility on September 4, 5, and 6, 2007, and, in <br /> some cases, interviews with onsite personnel. The work summarized in this document will be <br /> conducted in accordance with the Arcadis BBL'S "General Work Plan for Oil House Soil <br /> Investigations, Pacific Gas and Electric Company Substations Throughout California," dated <br /> September 1,2007. <br /> The site-specific workplan summaries for each substation facility are attached to this letter. The <br /> workplan summary for each facility includes (1) a brief summary of the site conditions and identified <br /> key oil handling features, (2) a table presenting the soil sampling program and rationale, and (3) one <br /> to three figures showing site features and sampling locations. <br /> At each facility, soil sampling is proposed in the vicinity of key existing or former oil handling <br /> features, including transformer repair/handling buildings, transformer hoists or handling structures, <br /> aboveground storage tanks (ASTs) used to store mineral oil, and immediately adjacent oil-handling <br /> underground pipelines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.