Laserfiche WebLink
P o s PG C ral Coast Sulol;=rk2lans and Re s Bel o a Sub CADD B l o a Sub SIte olan.dwa12 2 e <br /> TRANSFORMER <br /> HANDLING TOWER EXPLANATION <br /> i I <br /> / —•—•—_ - FENCE <br /> RAILROAD TRACK <br /> / -- – HISTORICAL FEATURES <br /> SUBSTATION EQUIPMENT <br /> P-1 / / <br /> OVERHEAD POWER POLES AND TOWERS <br /> PROPOSED SOIL BORING LOCATION <br /> / P-3 / <br /> / AST ABOVEGROUND STORAGE TANK <br /> TRANSFORMER <br /> REPAIR BUILDING <br /> SOURCE:PACIFIC GAS AND ELECTRIC COMPANY DRAWING 400666, <br /> GENERAL ARRANGEMENT OUTDOORS BELLOTA SUBSTATION <br /> DETAIL A: TRANSFORMER REPAIR BUILDING <br /> 0 20 40 FEET <br /> I <br /> APPROXIMATE SCALE <br /> i <br /> + <br /> CONCRETE FOUNDATION +/ <br /> FORMER OIL PUMP HOUSE +/ <br /> VAULT WITH +/ <br /> UNDERGROUND PIPING +/ <br /> CONCRETE PAD FOR +/ <br /> P-4 FORMER ASTs <br /> P-5 E /+ <br /> P6 ` <br /> /+ FORMER ASTs <br /> + <br /> +/ FIGURE 2B <br /> +/ DETAILS A AND B <br /> WITH PROPOSED BORINGS <br /> / <br /> ,/+ I BELLOTA SUBSTATION <br /> +/+ PACIFIC GAS AND ELECTRIC COMPANY <br /> +/ <br /> BELLOTA SUBSTATION <br /> DETAIL B: ABOVEGROUND STORAGE TANKS SAN JOAQUIN COUNTY,CALIFORNIA <br /> 0 20 40 FEET I ERRA PACIFIC GROUP <br /> APPROXIMATE SCALE Environmental Engineering,Consulting,and Construction <br /> i <br /> �I <br /> i <br />