Laserfiche WebLink
Sacramento Insulation Contractors Project No. EOC-96-028 <br /> (., RECOMMENDATIONS <br /> + Based on the results of the activities detailed in this report, EOC recommends that no additional <br /> assessment or mitigation efforts be required on the site and that Sacramento Insulation <br /> Contractors be issued a "no further action" letter by PHS for the site. <br /> t REPORT LIMITATIONS <br /> L <br /> This report has been prepared exclusively for the use of Ms. Ginny Spencer and The Hill <br /> ( Companies, Inc., and for review by Mr. Harlin Knoll, the PHS specialist assigned to the site. The <br /> L_ client should recognize that the limited site assessment activities, including soil and groundwater <br /> sampling and laboratory testing described in this report, should not be interpreted as a <br /> { characterization and statistical evaluation of the entire site but is intended to document the <br /> ` excavation of 2 borings on the site. The assessment activities detailed in this report do not <br /> preclude the possibility of the presence of petroleum hydrocarbons, or hazardous materials in <br /> other areas of the site. <br /> L- The information obtained in assessing the petroleum hydrocarbon impacts on a site can vary at <br /> different times and different locations and the interpolation or extrapolation of such data results <br /> in some degree of uncertainty. Additionally, the client should recognize that regulatory agencies <br /> 1„ possess the final authority relative to site assessments, mitigations, and closures and may direct <br /> the performance of services beyond those proposed or performed and described in this report. <br /> Therefore, the conclusions and recommendations presented in this report should only be <br /> considered conclusive with respect to the information contained herein. No guarantee of the <br /> results presented in this report is implied or intended. The services performed were conducted in <br /> accordance with the local standard of care in the geographic region at the time the services were <br /> rendered. <br /> We hope the information contained in this report will provide the documentation necessary for <br /> t closure of the LIAR reported for the site. Additionally, we wish to express our thanks to Mr. Knoll <br /> �. for visiting the site during the performance of the field activities and for assisting in the field <br /> decision making process. If you or Mr. Knoll have any questions or require additional <br /> f information, please call me at (619) 676-0046. <br /> Sincerely, <br /> l� <br /> David A. Eminhizer Peter M. Stang <br /> t> Environmental Scientist Registered Ge gist <br /> EnvirOmega Consultants No. 5219 <br /> 1 <br /> L Enclosures: Appendix A-Work Plan <br /> Appendix B - Boring Logs <br /> Appendix C - Laboratory Data <br /> L cc: Mr. Harlin Knoll, PHS <br /> I <br /> L <br /> t EnvirOmega Consultants 5 December 11,1996 <br /> L <br />