My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FONTANA
>
2130
>
3500 - Local Oversight Program
>
PR0545053
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 10:49:24 AM
Creation date
12/11/2019 9:32:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545053
PE
3528
FACILITY_ID
FA0005720
FACILITY_NAME
SMITH CANAL PUMP STATION
STREET_NUMBER
2130
STREET_NAME
FONTANA
STREET_TYPE
DR
City
STOCKTON
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
2130 FONTANA DR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COS January 1996 Meeting k <br /> Page 3 <br /> _ I <br /> The:1purpose of the scope of work proposed in this work plan is to compile a complete site j <br /> assessment report with all data obtained to date. All soil and groundwater analyses 4 <br /> obtained to date should be tabulated. The estimated extent of the contamination should be <br /> contoured on cross sections which include lithological strata and well construction details. <br /> A mass balance should be calculated for each concentration contour. The environmental <br /> attenuation, leachability, waste characterization and monitoring well data presented in this <br /> report will be used to determine the risk of leaving the waste in place, or the benefit of <br /> establishing and implementing site specific cleanup goals. i <br /> The compliance date for the work plan is February 29, 1996 <br /> The next meeting to discuss COS sites was scheduled for Tuesday, April 16, 1996 at 1:30 p.m. <br /> and will be held at the office of PHS/EHD. PHS/EHD appreciates the efforts of the COS to work <br /> cooperatively. <br /> Please contact either Mary Meays at (209)468-0337, Steve Sasson at (209)468-3459 or Linda f <br /> Turkatte at (209)468-3441, if you have any questions or disagree with this summary. <br /> f <br /> Dt <br /> nna Heran, REHS, Director ` <br /> me tal Health Division p <br /> Diane M. Hinson REHS <br /> Supervisor kk! <br /> MM\COSI.MET ! <br /> cc: Elizabeth Thayer, CVRWQCB cc: Jim Escobar, COS Public Works <br /> cc: Stephen Chen, COS Public Works cc: Bob Murdoch, COS Public Works <br /> cc: K.D. Jones, Twinning cc: Tom Lutterman, Smith Environmental <br /> k <br />
The URL can be used to link to this page
Your browser does not support the video tag.