Laserfiche WebLink
(! r <br /> TABLE',2 <br /> Laboratory Analysis ' Groundwater <br /> Smiths Canal Pump Plant <br /> Page 1 of 6 <br /> (in ppb) <br /> Date Sample ID B T E X TPHd <br /> 10/24/89 Mw1 ' <0.3 <0.3 <0.3 <0.3 <30.0 <br /> 03/18/92 Mw1 <0.5 <0.5 <0.5 <0.5 <100 <br /> 06/23/92 Mw1 <0.50 <0.50 <0.50 <0.50 <50 ` <br /> 09/14/92 Mw1 <0.50 < <50 <br /> 0.50 <0.50 <0.50 <br /> 12/09/92 Mw1 <0.50 <0.50 <0.50 <0.50 <50 <br /> 03/31/93 Mw1 <0.50 <0.50 <0.50 <0.50 <50 <br /> 08/10/93 Mw1 <0.50 <0.50 <0.50 <0.50 <50 <br /> 02/03/94 Mw1 <0.50 <0.50 <0.50 <0.50 <50 <br /> 04/25/94 Mw1 - <0.50 <6.50 <0.50 <0.50 <50 <br /> r <br /> ii <br /> w:\94369\tables\h201ab.doc <br />