Laserfiche WebLink
t <br /> i <br /> i r � <br /> 1� <br /> ' , anitarinWaterWork <br /> Welt Develo meat prot�Ql <br /> ie <br /> Groundwater monitoring wells will d <br /> the surface seal. be developed <br /> the casinge <br /> Approximately if s time' the valumarafaw ter <br /> Settin sible <br /> incalculatel <br /> Inthefollowing manner . C383rtg volumes will ba <br /> ._; <br /> 0 Volume of <br /> Schedule 40 PVC Pipe <br /> Diameter I.D. <br /> (inches) (inches) <br /> Volume 4, <br /> ----------------.------------Gal/linear ft. <br /> ! 2 067 -------------- a <br /> 0.17 <br /> 4 4.026 <br /> 0.66 <br /> Volume Of Open Borehole andAnnular s <br /> ,a Between Casing and HoleSpace <br /> H <br /> { Hole Vole/ <br /> t linear ft. Volume/ <br /> r Diameter of hole Casing <br /> linear ft, of* s <br /> (inches) Gal. Cu. f 9 D33meter AnnuZa <br /> --- - -------------------t-- (inches) Gal. r Space <br /> 7.25- 2.14 --- -------- ---------- ------Cu-_Ft. w ` <br /> 1' 0.29 2 - <br /> 1.91 0.26 <br /> k 8..25 2.78 <br /> 0.37 2 <br /> 2.55 0.34 <br /> 10.25 4.29 0.57 <br /> t 10.25 2 4.06 0.54 2" <br /> 4:29 0.57 <br /> 12.25 4 3.46 0.46 <br /> a 6.13 0.82 <br /> 4. 5.30 0.71 <br /> ix *Note: Annular volumes will <br /> Porosity of filter be multiplied by 30$ to account for <br /> pack. <br /> �c <br /> Yf. the ...a ..-fifer._. <br /> until recharge isstoo sloslow w to charge, development will continue <br /> Of water practically continue. The volume <br /> Produced versus time will be recorded. <br />