Laserfiche WebLink
----------------------- <br /> ------------------ <br /> GROUNDWATER SAMPLING FORM <br /> /f(..'..n.... <br /> PRt3[E:CTIFOR <br /> [ T1Ql _ _ <br /> rf,.j PROJECT NAMES ,t`11_ Ff'!_sS�/'f ilG+t/( PROJECT NUMBER:SLf `6ZS7iC9�........ ELL NO,—A4.._ PJ3.,..•....:..,.•..:..-.'._..... <br /> PROJECT MANAGER: TYPE OF WELL: _Monitoring Extraction Other <br /> RECORDED BY: SAMPLED BY: DATE: DC� a4 <br /> PURGE VOLUME PURGE METHOD <br /> Wel!Casing Diameter <br /> _�__/2-inch —4-Inch Other —Bailer r - Type / <br /> - <br /> Well Total Depth 2-S-1 :� feet below Tap of Casing,Ta Pump TypeOther - Specify <br /> Depth to Water 1 feet below Top of Casing,WL Hydrocarbon Odors:/ <br /> 9t <br /> Water Column Length feet Yes —,- No <br /> Purge Volume <br /> rr Calculation (WaterColumnLength x Multiplier x No.Volumes = Calculated Purge Volume) <br /> 4 `7 X i f X S = '2 - 13 Calculated Purge Volume = "� allons <br /> (WCL) (Multipiler) (No.Volumes) Actual Purge Volume = allons <br /> c: 00 <br /> ..-.. st•- .Dlamet�E~,: <br /> Groundwater Parameter Measurement: Meter Type <br /> S�Qalibrated:,_Yes No <br /> TIME ELAPSED FI.OWRATB DTW pH I EC 1EME TURBIDITY REDOX COMMENTS <br /> TIME (GPNI) (ft) a-nhWcm d (NTU) mV <br /> LIA ALP <br /> F4 F <br /> /;act) r <br /> VNICASSOCIATES INC. <br /> ENWRONMENfAL,GEOTECHNICAL AND MATERIALS PROFESSIONALS <br />