Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> F?fO. ECT'':f�IFa.RIF4TiJ. l <br /> PROJECT NAME:4Lt Ssvt j 4-h PROJECT NUMBER-54'(OZ5 zirrIWELL NO, AA M 5 <br /> PROJECT MANAGER: TYPE OF WELL: L/—Monitoring Extraction Other <br /> RECORDED BY: SAMPLED BY: Ar DATE:__ <br /> k....... <br /> PURGE.VOLUME PURGE METHOD <br /> Well Casing Dlameter <br /> 2-inch 4-Inch Other <br /> _­Seiler - Type ,J'�� <br /> Pump - TYPeC- T+ �-" <br /> Wei]Total Depth Z ) feet below Top of Casing,Ta Other - Specify <br /> Depth to Water 14131. feet below Top of Casing,WL <br /> Hydrocarbon Odors/ <br /> Water Column Length i q 1!'- feet Yes f No <br /> Pyrge Volume Calculation (Water Column Length x Multiplier x No.Volumes = Calculated Purge Volume) <br /> ?� X r lD X L9 Z t� Calculated Purge Volume = 2-9% 2-0 ciallons <br /> (WCL) (Multipller) (No.Volumes) Actual Purge Volume = allons <br /> :.:....; <br /> Groundwater Parameter Measurement: Meter Type �� Caliiirated:_ es No <br /> TIME ELAPSED FLOWRAT€ DTW pH EC 7 TURBIDITY REDOX COMMENTS <br /> TIME �r' (ft) trnhoslcm eg C (NTV) rnV <br /> Lam-- �J n-n <br /> 17 <br /> \VAN <br /> ASSOCIATES INC. <br /> ENVIRONMENTAL,GEOTECHNICAL AND MATERIALS PROFESSIONALS <br />