Laserfiche WebLink
R% <br /> WORK REQUEST FORM <br /> Date of Request: 010699 Requested Completion Date: 011199 <br /> Proj Name: Stockton Smith Canal Proj No: 62574.0002 <br /> Site Address:Fontana St. & Smith Canal Stockton Ca. Task: <br /> Project Manager: Jeanne Homsev Field Tech: A. Flores <br /> Client Contact: Jim Escobar Phone No: 209-944-8438 <br /> Regulatory Contact: Jeff Wong _ Phone No: 209-468-0335 <br /> Approval: �T1A Completion Date: 4_l 9q <br /> Notify regulator 48 hours prior to site arrival. _ <br /> Monitor DTWIDTB all wells on site. In order:MW-1.5,6,2,3 & 4. <br /> Purge and sample all well in the same order. Do not sample MW-4 if it has free <br /> product. _ <br /> Sample for TPHODiesel. _ <br /> Samples to Sequoia Analytical. <br /> Monitor W-4 with the interfac be. <br /> Contain all-X-urge water. Drums on site. Discharge purge water into sanitary <br /> sewer manhole per permit. _ <br /> Bail and store free product on site. In double container. <br /> Wells are 28 feet deep. Water is at 12 feet. Wells are 2 and 4 inch diameter. <br /> Wells will flow around 2 gallons per minute. _:... .,,_.... <br /> Prepare purchase requisition form for samples. AF <br /> 'a <br /> AFLOREST-WORK.doc <br />