Laserfiche WebLink
r <br /> WORK REQUEST FORM <br /> Date of Request: 062497 Requested Completion Date: 070197 <br /> Proj Name: Stockton Smith Canal Proj No: 94-369 Phase: 01 <br /> Site Address: Fontana St. & Smith Canal Stockton Ca. Activity: 10 <br /> Project Manager: Jeanne Homsey Field Tech: A. Flores <br /> Client Contact: Jim Escobar Phone No: 209-944-8438 <br /> s,cV,- S soo J 345-5 <br /> Regulatory Contact: Phone No: 209-468-344,1- <br /> Approval: Completion Date: !D-7bZ9 7 AE: <br /> Notify regulator 48 hours prior to site arrival. 74f- <br /> Monitor DTWIDTB all wells on site. In order:MW-6,5,2,1,3 & 4. <br /> `= <br /> Purge and sample MW-6.2.3 and 4 if no product). <br /> Sample for TPHaDiesel. <br /> Samples to Sequoia Analytical. <br /> Monitor well 4 with the interface probe. <br /> Contain all purge water. Take two drums. Discharge purge water into sanitary <br /> sewer manhole per permit. <br /> Bail and store free product on site. In double container. <br /> Wells are 28 feet deep. Water is at 12 feet. Wells are 2 and 4 inch diameter. <br /> Wells will flow around 2al�per minute. <br /> Prepare Purchase Order. <br /> AFLOREST-WORK.doc <br />