Laserfiche WebLink
;r WORK REQUEST FORM <br /> f: <br /> Date of Request: 100396 Requested Completion Date: 102296 <br /> Proj Name: Stockton Smith Canal Proj No: 94-369 Phase: 01 <br /> Site Address: Fontana St. & Smith Canal Stockton Ca. Activity: 10 <br /> Project Manager: Jeanne Homsey Field Tech: A. FIores <br /> Client Contact: Jim Escobar Phone No: 209-944-8438 <br /> Regulatory Contact: Linda Turkatte Phone No: 209-468-3441 <br /> Approval: Completion Date: Z-Z-ct(-:) *(-- <br /> ;�:7 � <br /> Notify regulator 48 hours prior to site arrival. <br /> Monitor DTW/DTB all wells on site. In order:MW-6,5,1,2,3 & 4. <br /> Purge and sample all wells. MW-6,3 and 4 {if no product). In order. <br /> Sample for BTEX and TPH(&Diesel. <br /> Samples to Sequoia Analytical. <br /> Monitor well 4 with the interface_probe. _ <br /> Contain all purge water. Take three drums. Discharge purge water into sanitary <br /> sewer manhole per permit. <br /> Bail and store free product on site. In double container. <br /> Wells are 28 feet deep. Water is at 12 feet. Wells are 2 and 4 inch diameter. <br /> Wells will flow around 2 gallons per minute. <br /> Prepare Purchase Order. 1 <br /> AFLORFST-WORK,doc <br />