Laserfiche WebLink
t � <br /> RESNA <br /> SITE SAFETY PLAN <br /> Physical Hazards <br /> f ' <br /> w <br /> t i 1 Heavy Equipment (Noise & Physical All heavy equipment used on this project will be <br /> contact) in good working order and operated in <br /> accordance with recognized industry standards <br /> and Cal-OSHA Title 8. Subchapter 4. <br /> <=i Construction Safety Orders. In addition. an <br /> exclusion zone applies to all personnel. The <br /> exclusion zone will be 20 feet to the front and <br /> either side of the operating drill rig. Personnel <br /> -1 will not be allowed under booms or augers at <br /> any time. <br /> j All equipment operators and ground crews <br /> working in dose proximity of heavy equipment <br /> will be supplied with ear protection. <br /> 1 Dust The dust hazard will be mitigated by not <br /> allowing ground crew to be located down wind <br /> of drilling and excavation activity. In addition. <br /> water will be applied to control the dust if <br /> visible levels of dust are generated- <br /> F=s� <br /> Fire and Explosion Hazards <br /> List Flammable or Combustible materials on-site. Keep sources of ignition away from these materials. <br /> F)ammable flash pouat S7Qp aFl . Combustible (F-ash!Point <200 °F) <br /> :..� ..... ::. <br /> Gasoline Diesel <br /> Type and Location of Fire Extinguishers (Show on map for large projects) <br /> During Tasks 1 & 2 a multipurpose (ABC) dry chemical fire extinguisher will be located in all RESNA <br /> kk vehicles located on-site. <br /> PAGE 4 <br /> ,7 <br />