My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009463
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FONTANA
>
2130
>
3500 - Local Oversight Program
>
PR0545053
>
ARCHIVED REPORTS_XR0009463
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 11:38:25 AM
Creation date
12/11/2019 10:26:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009463
RECORD_ID
PR0545053
PE
3528
FACILITY_ID
FA0005720
FACILITY_NAME
SMITH CANAL PUMP STATION
STREET_NUMBER
2130
STREET_NAME
FONTANA
STREET_TYPE
DR
City
STOCKTON
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
2130 FONTANA DR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> RESNA <br /> SITE SAFETY PLAN <br /> PERSONAL PROTECTIVE EQUIPMENT <br /> As a minimum Level D protection is required on all RESNA worksites. Level D includes: <br /> V Steel toed boots <br /> ` V Safety Glasses <br /> V Hard Hat <br /> For each task on this project, identify additional protective garments as required, include the conditions <br /> under which the level of PPE would be modified for each task. <br /> r <br /> 7askis) Cin itIM I rsorin l.. .. .....`. G irm�r�fl } <br /> Working Near Vehicle Orange Vests <br /> :i <br /> 1, 2 >20 ppm for 5 minutes 1/2 Face Respirator <br /> T. 1, 2 >200 ppm for 5 minutes Evacuate Site Full Face Respirator <br /> I 'i <br /> F= SITE CONTROL AND COMMUNICATIONS <br /> The buddy system must be used on all RESNA hazardous waste sites. <br /> Site will be secured as follows: Fencing will be used when possible. <br /> 4r� <br /> i Work Zones will be marked as follows: Barricades and caution tape will be used to mark off <br /> work zone, if appropriate. <br /> MARK WORK ZONES ON SITE MAP ❑ CHECK WHEN DONE. <br /> f PAGE 7 <br /> E <br />
The URL can be used to link to this page
Your browser does not support the video tag.