My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009465
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FONTANA
>
2130
>
3500 - Local Oversight Program
>
PR0545053
>
ARCHIVED REPORTS_XR0009465
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 11:59:36 AM
Creation date
12/11/2019 10:27:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009465
RECORD_ID
PR0545053
PE
3528
FACILITY_ID
FA0005720
FACILITY_NAME
SMITH CANAL PUMP STATION
STREET_NUMBER
2130
STREET_NAME
FONTANA
STREET_TYPE
DR
City
STOCKTON
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
2130 FONTANA DR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fry <br /> RESNA Industries Inc. AINAMA <br /> r..; Quality Assurance/Quality Control Plan <br /> Revised November I992 <br /> To reduce the potential for cross contamination between wells, the monitorings will take place <br /> �- in order from the least to most contaminated, if known. Wells containing free product will be - <br /> F' monitored last. Between each well monitoring the equipment will be decontaminated. <br /> Water level data collected from the wells will be used to G: developa groundwater contour g map <br /> for the project site. Groundwater flow will be estimated to be perpendicular to equipotential <br /> lines drawn on the map. <br /> I0.0 WELL DEVELOPMENT PROTOCOL <br /> Groundwater monitoring wells will be surged and developed prior to setting the surface seal- <br /> E Approximately 10 times the volume of water in the casing will be withdrawn if possible. Casing <br /> volumes will be calculated in the following manner: <br /> C VOLUME OF SCHEDULE 40 PVC PIPE <br /> Diameter (inches) I.D. (inches) Volume " <br /> ralflin <br /> G ear feet <br /> 2 2.067 0.17 <br /> _=+ 4 4.026 0.66 <br /> VOLUME OF OPEN BOREHOLE AND ANNULAR SPACE BETWEEN CASING.AND=H:OLEn <br /> VolumelLinear Feet of Hole Nominal VolumelLinear feat:.ofFr= <br /> Hole <br /> Casing Annular Space.* <br /> Diameter Diameter f <br /> (inches) Gallons Cubic Feet finches) Gallons Cubic Feet_; <br /> 7.25 2.14 0.29 2 7.91 0.26 <br /> 8.25 2.78 0.37 2 2.55 0.34 <br /> r:- <br /> 10.25 4.29 0.57 2 4.06 1 0.54 <br /> 10.25 4.29 0.57 4 3.46 0.46 <br /> 12.25 6.13 0.82 4 5.30 0.71 <br /> Annular volumes will be multipfied by 30%to account for porosity of Filter pack. <br /> QAQC1an.wL 8 <br /> �• <br />
The URL can be used to link to this page
Your browser does not support the video tag.