Laserfiche WebLink
RESNA <br /> SITE SAFETY PLAN <br /> 1 <br /> Physical Hazards <br /> f; Taslk[sl Hazard :.... Mitigation Measure <br /> 1 Heavy EqL*ment (Noise &Physical All heavy equipment used an this project wiz be <br /> coact) it good wonting order and operated it <br /> =.' accordance with recognized industry standards <br /> and C"SHA Tide 8, Subchapter 4, <br /> Construction Safety Orders. In addition. an <br /> F" axdusion zone applies to All personnel- The <br /> exclusion zone will be 20 feet to the front and <br /> either side of the operating dri rig. Personnd <br /> will not be avowed under booms or augers at <br /> any tine. <br /> F : <br /> AN equipment operators and ground crews <br /> working in dose proximity of heavy equipment <br /> will be supplied with ear protection. <br /> 1 Dust The drat hazard wi be mitigated by not <br /> slowing Wound crew to be located down wind <br /> ' of drilling and excavation activity. In addition, <br /> water will be applied to control the dust if <br /> visible levels of dust are generated. <br /> l' Fre and Explosion Hazards <br /> List Flammable or Combustible materials on-site. Keep sources of ignition away from these materials. <br /> Flerrrrnabls{Flesh Port 100 'F} Coinbustide (Flast Point <br /> Gasoline Diesel <br /> 177 <br /> Type and Location of Fire Extinguishers IShow on map for large projects) <br /> During Tasks 1 & 2 a multipurpose (ABC) dry chemical fire extinguisher will be located in all RESNA <br /> vehicles located on-site. <br /> jPAGE 4 <br /> F.r'.� <br />