My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREDERICK
>
23073
>
2900 - Site Mitigation Program
>
PR0524379
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 1:03:42 PM
Creation date
12/11/2019 11:56:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524379
PE
2965
FACILITY_ID
FA0016358
FACILITY_NAME
CALIFORNIA NUGGETS
STREET_NUMBER
23073
Direction
S
STREET_NAME
FREDERICK
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22813021
CURRENT_STATUS
01
SITE_LOCATION
23073 S FREDERICK RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> A-3.4 Well Survey <br /> The locations of soil borings and monitoring wells, and the elevation of the top of the PVC <br /> casings are usually surveyed and tied into permanent markers, if readily available. Survey <br /> accuracy is 0.1 foot for the "x" and "y" coordinates and .01 foot for the "Z" coordinate. The depth <br /> to static groundwater is measured from a set location at the top of the PVC casing (usually the <br /> north rim). The depth of water is then subtracted from the elevation of the top of the well casing <br /> to provide a groundwater elevation for each monitoring well location. <br /> A-4 GROUNDWATER MONITORING <br /> A-4.1 Water Level Measurements <br /> Water level measurements are made in the wells prior to purging and sampling the wells. <br /> Measurement protocol is as follows: <br /> 1. Prior to obtaining water level measurements, the monitoring wells would be opened and <br /> allowed to equilibrate for a period of approximately % hour. <br /> 2. The water level probe is decontaminated in a trisodium phosphate or non-phosphate <br /> detergent wash, followed by a distilled water rinse, prior to use in each well. <br /> 3. Water level measurements are made using a conductivity-based water-level meter. <br /> Depth-to-water is generally measured from a surveyed mark on the north rim of the PVC <br /> well casing. <br /> The water level measurements are converted to elevations using the surveyed casing elevations. <br /> A-4.2 Groundwater Sampling <br /> Groundwater samples are collected from the monitoring wells at the site. The sampling protocol <br /> for each well is as follows: <br /> 1. Down-well equipment (pumps, bailers, etc.) is decontaminated by steam cleaning, or by <br /> scrubbing in a trisodium-phosphate or non-phosphate detergent wash followed by a <br /> distilled water rinse, prior to use in each well. Bailer cord is replaced prior to use in each <br /> well. <br /> 2. The depth to groundwater is measured using a conductivity-based water-level meter. <br /> 3. The volume of water in gallons standing in the well is calculated by subtracting the depth <br /> to groundwater measurement from the depth of the well and multiplying by the <br /> appropriate conversion factor(0.16 for 2-inch wells, and 0.65 for 4-inch wells). <br /> 5 0890.EO I/S T05 R3 5 8/JDZ:1 v <br /> C 2005,Kleinfelder,Inc. Page A-5 <br /> April 29,2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.