My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
404
>
3500 - Local Oversight Program
>
PR0545067
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 9:11:56 AM
Creation date
12/12/2019 8:40:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545067
PE
3526
FACILITY_ID
FA0005019
FACILITY_NAME
BANNER ISLAND BALLPARK
STREET_NUMBER
404
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13741017
CURRENT_STATUS
02
SITE_LOCATION
404 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02 /19/ 02 14 : 29 FAX 916 372 4 :^W Wallace-Kuhl � � Q003 <br />�I CRYSTAL CREAM & BUTTER COMPANY <br /> 404 West Fremont Street <br /> Stockton, Calfomia <br /> Page 2 . <br /> Based on our research, we feel ozone injection will be a superior system to vapor <br /> extraction/air sparging because it will act to break down hydrocarbons and fuel <br /> oxygenates in place. In other words, we will not be required to permit the system with <br /> the local air quality authority nor will we have to use a carbon polishing system to scrub <br /> the effluent stream. In addition, the use of lower pressure systems reduces the likelihood <br /> that groundwater mounding will be observed beneath the site. <br /> The system we propose will have 10 points and will be operated off a single compressor <br /> and ozone generator hard-wired to an electrical source. All plumbing will be below <br /> grade to prevent vandalism or on-site wear and tear. The ozone generator/compressor <br /> comes as one compact unit and can be easily mounted to a wall or a fenced area. Finally, <br /> the device operates in virtual silence and has proven to be a marvelous method of <br /> treatment. <br /> During our treatment, we will continue quarterly water sampling of the existing wells. <br /> We expect to start to see dramatic reduction in groundwater hydrocarbon concentrations <br /> within six months of initial startup. <br /> All field work will be completed in accordance with the field procedures previously <br /> presented and approved by San Joaquin County Public Health Services Department. And <br /> as discussed, we are planning to place the ten injection points starting February 19, 2002. <br /> We appreciate the opportunity to implement this change in our original remedial action <br /> plan and please do not hesitate to contact our office immediately if this workplan <br /> addendum is not suited to your needs. <br /> Wallace-Kuhl & Associates, Inc. <br /> Kurt Balasek <br /> Senior Hydrogeologist RG, CHG <br /> 14:%Dept3%ActiveJobAl628.11 Crystal CreameryStockto\workplan Addendum <br />
The URL can be used to link to this page
Your browser does not support the video tag.