Laserfiche WebLink
CRYSTAL CREAMERY - STOCKTON <br /> WKA No 1628 01 <br /> • March 17, 1994 <br /> Page 7 <br /> the extent of ground water and soil contamination are established, a Problem Assessment Report <br /> will be prepared that will Include <br /> • a site plan showing locations of field tests <br /> • logs of soil borings and monitoring wells <br /> • laboratory test results with chain-of-custody documents <br /> • a site plan showing the lateral and vertical extent of contamination <br /> • a summary of findings Indicating extent of soil and ground water contamination <br /> A brief addendum workplan will be provided for any additional work to be completed at this site <br /> Time Line <br /> • Our field Investigation will begin within two weeks from the time San Joaquin County <br /> Environmental Health Division approves this workplan Our report of findings will be completed <br /> within four weeks from the time the field work is completed <br /> Wallace d Kuhl & Associates, Inc <br /> Z <br /> Richard Premzic Eric Hubbard <br /> Project Geologist Registered Geologist #4807 <br /> RP EJH rbn <br /> Attachments <br /> Copies to Steve Jerkins - Crystal Creamery <br /> R11628-01+.p2 <br /> WALLACE KUHL <br /> H :,Ipupr STASSOCIATSS INC <br />