My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010426
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
404
>
3500 - Local Oversight Program
>
PR0545067
>
ARCHIVED REPORTS_XR0010426
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 10:20:18 AM
Creation date
12/12/2019 9:40:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010426
RECORD_ID
PR0545067
PE
3526
FACILITY_ID
FA0005019
FACILITY_NAME
BANNER ISLAND BALLPARK
STREET_NUMBER
404
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13741017
CURRENT_STATUS
02
SITE_LOCATION
404 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
404 WEST FREMONT STREET <br /> f WKA No. 1628.09 <br /> ! 7 August 31, 2001 <br /> d Page 8 <br /> j` (TEFC),positive displacement air sparging blower used to inject pressurized atmospheric air in the <br /> groundwater. The air sparging system will be complete with instrumentation for measuring the <br /> following: <br /> • air flow rate <br /> • air pressure <br /> • temperature <br /> a dissolved oxygen in groundwater <br /> • pressure differential <br /> c- The airsparging system will beequipped with PVC piping, fittings, dilution valves an in-line 1 <br /> micron filter, a coalescing oil filter,pressure relief valve and wellhead connections. The <br /> sparging unit is also equipped with a chamber/absorption carbon steel discharge silencer, <br /> adjustable motor slide base, auto fault detection, auto power Ioss restart and automatic high <br /> s' temperature and pressure shutdown. <br /> Air Sparging SparPoints <br /> Existing air sparging points AS 1 through AS3 will be used to deliver pressurized ambient <br /> atmospheric air into the groundwater. Thirteen additional air sparging points will be installed <br /> within the petroleum hydrocarbon plume as part of the remediation process. <br /> Thirteen <br /> soil borings will be drilled to depths of 30 feet below surfaceade usin atruck-mounted <br /> � g <br /> => drill rig equipped with hollow-stem augers. The borings will be converted into air sparging points <br /> at the locations shown on Plate 3. Approximately 260 lineal feet of Schedule 40 Polyvinyl <br /> Chloride(PVC)piping will be installed underground then connected to the air sparging unit via <br /> trenches. <br /> The air sparging points will be constructed using one-inch diameter, flush jointed, Schedule 40 <br /> PVC casing; 0.01-inch slotted casing will be used for the screened interval(Plate 4). The screened <br /> =_ interval will extend from approximately 25 feet bsg to 30 feet bsg. Number 2112 sand will be <br /> placed as a filter pack in the well annulus. The filter pack will extend from the bottom of the <br /> <j <br />
The URL can be used to link to this page
Your browser does not support the video tag.