Laserfiche WebLink
August 12, 1996 <br /> CFA�1fl <br /> wSSOCIATES I' <br /> HL <br /> &ANC. <br /> Mr Steve Sasson <br /> San Joaquin County Public Health Services Dept <br /> P O Box 388 <br /> Stockton, Califorrua 95241-0388 <br /> WORKPLAN ADDENDUM <br /> CRYSTAL CREAM AND BUTTER COMPANY <br /> Stockton, Califorrua <br /> Dear Mr Sasson, <br /> We are writing to address your telephone comments of August 9, 1996 regarding <br /> our Site Investigation Workplan of June 5, 1996 Based on your comments, we <br /> have moved the proposed dual completion air sparging/vapor extraction well to <br /> within the former tank excavation We have additionally moved one of the <br /> proposed dual completion air sparging/vapor extraction observation wells to a <br /> positron northeast of the former tank excavation Finally, the proposed soil boring <br /> was moved to the southeast corner of the former excavation and a second soil <br /> boring was added northwest of the tank pit (near MW4) to investigate increasing <br /> Geotechnical Engineering <br /> contamination in this area The new locations of these wells and borings are <br /> Engineering Geology presented on the revised Plate 2 (attached) All construction procedures remain <br /> consistent with those presented in the June 5, 1996 workplan <br /> Environmental Consulting <br /> Remediation Services Tf-,,ou have apy questions Wath regard to our prop osed work, -lease do not hesitate <br /> l <br /> Construction Inspection to Call <br /> Materials Testing <br /> ;Seruor <br /> Balasek <br /> 3050 Industrial Blvd Hydrogeologist R G, C H <br /> West Sacramento <br /> P � <br /> . CA 95691 KB sdm <br /> Fax 916 372 2565 Copy to Steve Jerkins, Crystal Cream and Butter Company <br /> 9163721434 KumIfi28 07 wPw <br /> Remcied paper <br />