Laserfiche WebLink
13 August 2004 <br /> AGE-NC Project No . 95-0167 <br /> Page 9 of 9 <br /> 3 : 8,. BORING ABANDONMENT <br /> The CPT borings will be permanently sealed to prevent vertical migration ofpotential contaminants. <br /> Soil borings shall be abandoned by backfilling with bentonite or cement-bentonite slurry from the <br /> total depth to surface grade. The EHD will be notified for grout inspection at least 72 hours prior to <br /> grouting the borings. <br /> Advanced GeoEnvironmental, Inc. <br />