Laserfiche WebLink
l :r <br /> r <br /> 15 June 2004 <br /> AGE-NC Project No. 95-0167 <br /> Page 4 of 4 <br /> Ei M <br /> 5.0. RECOMMENDATIONS !{ <br /> ! <br /> r <br /> ` Based on present site conditions, AGE recommends: <br /> • Continued quarterly ground water monitoring at the site as required by the EHD. The next it <br /> monitoring event was performed in March 2003. <br /> • Preparation of a Corrective Action Plan(CAP)or closure report which ever document is not Ei <br /> suitable. The CAP should include a discussion and recommendation of remediation options ,1 <br /> for the site(e.g.in-situ air or ozone sparging,soil vapor extraction,ground water extraction, <br /> or monitored natural attenuation). <br /> M <br /> 6.0. LIMITATIONS <br /> `i <br /> Our professional services were performed using that degree of care and skill ordinarily exercised byf <br /> environmental consultants practicing in this or similar localities. The findings were based mainly <br /> upon analytical results provided by an independent laboratory. Evaluations of the hydrogeologic E <br /> r` conditions at the site for the purpose of this investigation are made from a limited number,of E� <br /> available data points (i.e.monitoring wells and ground water), and subsurface conditions may vary <br /> away from these data points.No other warranty,expressed or implied,is made as to the professional i <br /> interpretations, opinions and recommendations contained in this report. <br /> ?: r <br /> �I <br /> i <br /> i� <br /> I <br /> 1 <br /> !i <br /> ` Advanced GeoEnvironmental;Inc. <br /> �f i! <br />