Laserfiche WebLink
05 September 2003 <br /> • P <br /> AGE-NC Project No 95-0167 <br /> Page 4 of 4 <br /> • Preparation of a Corrective Action Plan (CAP) The CAP should include a discussion and <br /> recommendation of remediation options for the site (e g in-situ air or ozone sparging, soil <br /> vapor extraction, ground water extraction, or monitored natural attenuation) <br /> ' 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site for the purpose of this investigation are made from a limited number of <br /> ' avaiIable data points(i a monitoring wells and ground water), and subsurface conditions may vary <br /> away from these data points No other warranty,expressed or implied,is made as to the professional <br /> interpretations, opinions and recommendations contained in this report <br /> • <br /> Advanced GeoEnwonmental,Inc <br />