Laserfiche WebLink
r <br /> ' 08 July 2002 <br /> • AGE-NC Project No 95-0167 <br /> ' Page 4 of 4 <br /> ' 5 0 RECOMMENDATIONS <br /> Based on present site conditions, AGE recommends <br /> • Continued quarterly ground water monitoring at the site The next monitoring event should <br /> be scheduled for August 2002 <br /> ' 0 Preparation of a Corrective Action Plan (CAP) The CAP should Include a discussion and <br /> recommendation of remediation options for the site (e g in-situ air or ozone sparging, soil <br /> ' vapor extraction, ground water extraction, or attenuation) <br /> 60 LIMITATIONS <br /> ' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing In this or similar localities The findings were based mainly <br /> upon analytical results provided by an Independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site for the purpose of this investigation are made from a limited number of <br /> available data points (I e monitoring wells and ground water), and subsurface conditions may vary <br /> away from these data points No other warranty,expressed or implied,Is made as to the professional <br /> ' interpretations, opinions and recommendations contained in this report <br />' Advanced GeoEnvironmental,Inc <br />