Laserfiche WebLink
r' <br /> 03 January 2002 <br />' AGE-NC Project No 95-0167 <br /> Page 4 of 4 <br /> 5.0 RECOMMENDATIONS <br /> Based on present site conditions, AGE recommends continued quarterly ground water monitoring <br /> at the site The next monitoring event should be scheduled for March 2002 <br />' 6.0. LIMITATIONS <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing m this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the <br />' geologic/hydrogeologic conditions at the site for the purpose of this investigation are made from a <br /> limited number of available data points (i a monitoring wells and ground water), and subsurface <br /> conditions may vary away from these data points No other warranty, expressed or implied, is made <br />' as to the professional recommendations contained in this report <br /> 1 <br /> Advanced GeoErvironmentai,Inc <br />