Laserfiche WebLink
DYNAMIC BACK PRESSURE TEST DATA (BLOCKAGE) TECHNICIAN:ZANE NIMMO <br /> Cert#0083 Exp. <br /> Site: PACIFIC SERVICE STATION Date: 8/28/18 Time: <br /> Nozz/Fuel 20 CFH 60 CFH 100 CFH PASS/FAIL Nozz/Fuel 20 CFH 60 CFH 100 CFH PASS/FAIL <br /> Grade (.15"Water) (.45"Water) (.95"Water) Grade (.15"Water) (.45"Water) (.95"Water) <br /> 1/2 ALL PASS --- <br /> 3/4 ALL PASS --- <br /> 516 ALL PASS --- <br /> 7/8 ALL PASS --- <br /> 9/10 ALL PASS --- <br /> 11/12 ALL PASS --- <br /> 13/14 ALL PASS --- <br /> LIQUID REMOVAL CHECK "See Long Form Test Report for Wet Failure Testing I Blockage Tester Integrity: <br /> D=Dry I "w.c. 5 minutes PASS <br /> ❑DRY ❑DRY ❑DRY ❑DRY []DRY ❑DRY ❑DRY ❑DRY ❑DRY <br /> Oil nil ml ml ml ml mi ml ml <br /> ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY []DRY []DRY ❑DRY ❑DRY <br /> M1 ml ml nil ml mI mi ml mi <br /> ❑DRY ❑DRY ❑DRY []DRY ❑DRY ❑DRY []DRY ❑DRY ❑DRY <br /> ml ml ml ml ml ml ml ml ml <br /> ❑DRY []DRY ❑DRY ❑DRY ❑DRY []DRY ❑DRY []DRY ❑DRY <br /> M1 W ml ml ml ml H ml ml <br /> ® Job Complete Repairs Done to Pass Test: <br /> ❑ Not Complete Re airs Still Needed: <br /> Parts: None Drop Tube rings Fill Adaptor Gaskets Hoses Whip Hose <br /> Nozzles Breakawa s PV Valves Others: <br />